March 21st - Close Authorization for Jockvale Road from Greenbank Road to Longfields Drive

Under the following conditions:


Duration:

  • Friday March 26th 2021 at 7:00pm until Saturday March 27th 2021 at 10:00am

  • Friday April 9th 2021 at 7:00pm until Saturday April 10th 2021 at 10:00am

  • Saturday April 10th 2021 at 7:00pm until Sunday April 11th 2021 at 10:00am

  • Thursday April 29th 2021 at 7:00pm until Friday April 30th 2021 at 6:00am

Signage/Conditions:

  • Ensure all travel lanes, including bike and pedestrian facilities, are not obstructed by signage, equipment, or materials at all times.

  • Maintain access to adjacent dwellings and businesses at all times. This includes emergency vehicle access.

  • At any time during the work, the City Traffic Management Inspector, at his/her discretion may require the contractor to supply and install additional traffic control devices (signs, barrels etc.) and/or retain point duty police to control traffic. The contractor is responsible for all costs.

  • Contractor is to install the beacon lite detour and traffic plans dated January 13th 2021.

  • Contractor is to provide the following PVMS messaging to facilitate the detours/closures.

Aecon Construction Ontario East Limited will be performing work on the watermain and completing a watermain connection.